10 Stages of Building Process

Prepare Construction Site and Pour Foundation

  • Apply for and Acquire Permits
  • Construction Crew Levels Site
  • Puts Up Wooden Forms for the Temporary Foundation
  • Footings Are Installed

Rough Framing

  • Floor System, Walls, Roof Systems Are Completed
  • Sheathing Applied to Exterior Walls, Covered with Protective Wrap

Complete Rough Plumbing, Electrical HVAC

Installation:
    • Pipes and Wires
    • Sewer Lines and Vents
    • Water Supply Lines
    • Bathtubs, Shower Units
    • Ductwork for HVAC System
    • HVAC Vent Pipes

Install Insulation

Common Types of Insulation in New Homes

    • Fiberglass
    • Cellulose
    • Foam Mineral Wool
    • Concrete Blocks
    • Insulation Concrete Forms
    • Spray Foam
    • Structural Insulated Panels
    • Foam Board or Ridged Foam

Complete Drywall and Interior Fixtures, Start Exterior Finishes

  • Drywall is Hung and Taped
  • Texturing is Completed
  • Primary Coat of Paint is Applied
  • Exterior Finishes (Brick, Stucco, Stone) Are Installed
  •  

Finish Interior Trim, Install Exterior Walkways and Driveway

  • Doors, Windowsills, Decorative Trim Installed
  • Cabinets, Vanities, Fireplace Mantles Installed
  • Final Coat of Paint

Install Hard Surface Flooring, Countertops; Complete Exterior Grading

Ceramic tile, vinyl and wood flooring are installed as well as countertops. Exterior finish grading is completed to ensure proper drainage away from the home and prepare the yard for landscaping.

Finish Mechanical Trims; Install Bathroom Fixtures

Light fixtures, outlets and switches are installed, and the electrical panel is completed. HVAC equipment is installed, and registers completed. Sinks, toilets, and faucets are put in place.

Install Mirrors, Shower Doors; Finish Flooring, Exterior Landscaping

Mirrors, shower doors and carpeting are installed, and final cleanup takes place. Trees, shrubs and grass are planted, and other exterior landscaping completed.

Inspection #5

A building-code official completes a final inspection and issues a certificate of occupancy. If any defects are found during this inspection, a follow-up inspection may be scheduled to ensure that they’ve been corrected.

Final Walk-Through

This is where you spot items that need to be corrected or adjusted!

Your Project Manager will walk you through your new home to acquaint you with its features and the operation of various systems and components and explain your responsibilities for maintenance and upkeep, as well as warranty coverage and procedures. It’s also an opportunity to spot items that need to be corrected or adjusted, so be attentive and observant. Examine the surfaces of countertops, fixtures, floors and walls for possible damage. Sometimes disputes arise because the homeowner discovers a gouge in a countertop after move-in and there’s no way to prove whether it was caused by the builder’s crew or the homeowner’s movers.

Design and Build Program

Build on your LOT

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Build on your LOT

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Build on your LOT

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Book a Free New Home Consultation with Us

Location

2812 Old Lee Hwy, Ste 100
A & C, Fairfax, VA – 22031

Contact Us